ПОТОЛОК+
01/ 09 services
Electrician services

Chandelier installation in Tashkent

We mount the chandelier on a hook or plate so the slab, not the film, carries the weight. We connect the existing outlet, assemble the shades and test every switch mode.

Chandelier installation
Chandelier installation
9services
18areas
Mon–Satby appointment
✓test after installation
01Service scope

What the work includes

We inspect, install and show the final result.

What the work includes

  • Inspection of the base and existing outlet
  • Chandelier assembly and mount preparation
  • Mounting, connection and insulated joints
  • Functional test after installation

About the work

A chandelier is fixed to the concrete slab or another sound base. With a stretch ceiling we use the existing platform and thermal ring — the film never carries the fitting.

We install pendant, flush and LED chandeliers. If the ceiling is already stretched, we inspect the existing point first and never promise a new opening without seeing it.

Cost depends on weight, mount type, assembly and the condition of the outlet. We confirm the amount from photos or after inspection, before work starts.

02Key details

Chandelier installation

Mounting, assembly and connection — including existing stretch ceilings

01

Fixed to the slab, not the ceiling film

02

Hook or mounting plate matched to the model

03

Shade assembly and electrical connection

04

Switch and lighting-mode test

Where it is used

Living roomBedroomKitchenHallway

A chandelier provides central light. Choose light-fixture installation for several room points, or sconce installation for wall lighting.

03How it works

From task to test — 4 steps

Scope and cost are agreed before installation, not after switch-on.

01

Task

Describe the issue or send photos of the point, appliance and installation area.

02

Inspection

We check the base, outlet, circuit and protection relevant to the job.

03

Agreement

Scope is confirmed before work starts, with any extras listed separately.

04

Installation

We isolate power, complete the work and test the result after switch-on.

05Questions

What customers usually ask

Short answers about installation, limits and quoting.

01Can you install it on an existing stretch ceiling?
Yes, when a platform or hook and outlet already exist behind the film. If there is no point, we inspect first; partial film removal may be required.
02Do you assemble the chandelier?
Standard assembly is included. Complex models with many pendants are quoted separately from photos.
03What affects the cost?
Weight, mounting type, assembly, height and wire condition. We agree the amount before starting.
06Areas

Chandelier installation: Visits across Tashkent and the region

Select an area — service tabs keep the chosen location.