Electrical wiring installation in Chilanzar district
We run cable for new points and dedicated circuits. The layout, route and installation method are agreed first, then cable length and panel connection are quoted.
Panel housing where the existing circuit comes first

What the work includes
We inspect, install and show the final result.
What the work includes
- Site inspection and point layout
- Marking and cable installation
- Outlet and joint preparation
- Connection, labelling and testing
About the work
New wiring is needed during renovation, kitchen relocation, socket additions or installation of high-load appliances. Lighting, general sockets and heavy loads require different circuits and protection.
Cable may be concealed, surface-mounted or run behind a building structure, depending on walls and renovation stage. Routes are agreed before chasing.
Cost is based on point count, cable length and substrate. Scope and timing are confirmed after inspection; we do not promise a whole apartment in one day.
Electrical wiring installation
New circuits for lighting, sockets and appliances — planned by points and load
Circuit plan based on actual loads
Route agreed before drilling and chasing
Separate outlets for lights, sockets and appliances
Circuits labelled and tested after installation
Where it is used
Wiring covers circuits and groups. Final sockets and fixtures, plus a new panel build, may be separate stages.
From task to test — 4 steps
Scope and cost are agreed before installation, not after switch-on.
Task
Describe the issue or send photos of the point, appliance and installation area.
Inspection
We check the base, outlet, circuit and protection relevant to the job.
Agreement
Scope is confirmed before work starts, with any extras listed separately.
Installation
We isolate power, complete the work and test the result after switch-on.
Chilanzar
Panel housing where the existing circuit comes first
Chilanzar has a large stock of older apartments where new appliances have often been added to the original layout over time. Before installation we inspect the point and circuit so a new socket or light does not hide an existing fault.
- 1Circuit plan based on actual loads
- 2Before adding a high load, we assess the circuit and protection rather than only the socket.
- 3For finished apartments we choose a route with minimal intervention in walls and ceilings.
- 4Route agreed before drilling and chasing
What customers usually ask
Short answers about installation, limits and quoting.
01Can wiring be replaced without wall chasing?
02How long will the work take?
03Do you connect new circuits at the panel?
Electrical wiring installation: Visits across Tashkent and the region
Select an area — service tabs keep the chosen location.
